Installation of protection system at STEAG power plant in Bergkamen / Germany

Bild: Rainer Knäpper, Lizenz Freie Kunst

As sub-contractor for a manufacturer of protection systems we have disassembled the old secondary systems and installed the new block-unit protection and synchronization system for block A of the STEAG coal power plant.

In addition to the erection of the switchgear cabinets, these were also completely re-wired according to the circuit diagrams and handed over to the customer for commissioning.

Despite difficult documentation, the installation was completed on schedule.