![](https://upload.wikimedia.org/wikipedia/commons/4/45/Kraftwerk_Heil_IMGP7286_wp.jpg)
As sub-contractor for a manufacturer of protection systems we have disassembled the old secondary systems and installed the new block-unit protection and synchronization system for block A of the STEAG coal power plant.
In addition to the erection of the switchgear cabinets, these were also completely re-wired according to the circuit diagrams and handed over to the customer for commissioning.
Despite difficult documentation, the installation was completed on schedule.