For the new construction of a sub station in Bad Vilbel in the north of Frankfurt, BS-consult has installed the network protection technology.
On behalf of the protection technology manufacturer BS carried out the installation of the switch cabinets and the connection of the protection technology in the switchgear.
Part of the construction was also the installation of control technology in the control center and its connection to the protection technology.
For the whole project a time expenditure of 4 weeks was planned. This timeframe for all activities was met.